- Recycled Plastic[1]
- Decorative Films[1]
- Other Plastic Products[1]
- Plastic Nets[6]
- Fiberglass Mesh[6]
- Animal Cages[6]
- Iron Wire Mesh[6]
- Steel Wire Mesh[6]
- Filter Meshes[3]
- Steel Wire[6]
- Other Security & Protection Products[6]
- Traffic Barrier[1]
- Other Animal Husbandry Equipment[1]
- Barbed Wire[6]
- Iron Wire[6]
- Contact Person : Ms. Wang Ning
- Company Name : Hebei Zhenheng Fences Powder Coating Co., Ltd.
- Tel : 86-318-5283285
- Fax : 86-318-5281016
- Address : Hebei,Raoyang county Hengshui,NO.3 Xingsheng Road Machangtun Village Tongyue Town Raoyang County
- Country/Region : China
- Zip : 053900
Related Product Searches:Dark green LDPE polyethylene powder coating,High Quality LDPE polyethylene powder coating,LDPE polyethylene powder coating PE-dark green 07
LDPE polyethylene powder coating
other name :Thermoplastic powder coating, Dipping powder coating, PE powder coating
Produced by modern advanced equipment technology, it is a new production of polyethylene material, adding functional additives, pigments and other components.
The coating is bulky, smooth, excellent flexible, with excellent chemical resistance, electrical insulation, excellent safety and health and surface decoration.
The powder coating is widely applied to the railing of highway network, railway rails, refrigeration equipment, refrigerator grids, racks, carriage of surface coating on the surface of the decorations and food industry equipment.
Technical index
No. | Test Items | Standard and methods | Quality performance |
1 | Particle size | GB/T6554-1986 | ≤5 |
2 | Melt index | GB/T3682 | 15~25 |
3 | Gloss level | GB/T1743 | ≥50(white≥30) |
4 | Flexibility | GB/T6742 | ≤2 |
5 | Brittle temperature | GB/T5470 | ≤-40 |
6 | Breaking elongation | GB/T1040 | ≥300 |
7 | Acid resistance (10%HCL, 168h) |
| No peeling, no fade |
8 | Alkali resistance (10%NaOH,168h) |
| No peeling, no fade |
9 | Saline resistance (10%NaCL,168h) |
| No peeling, no fade |
Construction of referenceconditions:
Rust and oil contamination on the surface of the work piece must be removed before processing. Preheating (450 ± 50 ° c) for certain time, specific heating temperature depends on the heat capacity of work piece size. After testing, the work piece is immersed in fluid bed (3-8s), and (180-240° c) baked a few minutes to leveling out cooling to room temperature (water or air cooling, or natural cooling).